民机项目风险量化方法及应用的研究
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Risk Quantification Methods and Application of Civil Aircraft Project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    民机项目中大量新技术的应用和众多复杂系统的集成,增加了项目进度、费用和性能的不确定性,在众多环节中风险因子要素层出不穷。为了保障民机项目过程的顺利进行,降低项目的风险水平,必须建立先进的风险管理体系。针对民机项目风险管理体系中的风险量化难题,深入挖掘风险量化手段本身的技术内涵,结合民机项目的特点,引入了模糊层次分析法的风险量化方法,并通过民机项目风险实例进行验证。

    Abstract:

    Civil aircraft projects include application of a large number of new technologies and integration of many complex systems. The uncertainty on project schedule targets, cost targets and performance targets is increased. In many aspects, the risk factors have been increasing. In order to ensure the research process of civil aircraft programs smoothly and reduce the projects risk level, an advanced risk management system must be established. For the risk quantification problem on risk management system of civil aircraft project, this article explores the technical content of risk quantitative measures, combining the characteristics of civil aircraft projects. The risk quantification method of Fuzzy Analytic Hierarchy Process was introduced and verified by risk instance of civil aircraft project.

    参考文献
    相似文献
    引证文献
引用本文

徐凯.民机项目风险量化方法及应用的研究[J].民用飞机设计与研 究,2015(4):97-Xu Kai. Risk Quantification Methods and Application of Civil Aircraft Project[J]. Civil Aircraft Design and Research,2015,(4):97-. ( in Chinese)

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2016-01-25
  • 出版日期:

微信公众号二维码

手机版网站二维码

我要投稿 投稿指南 联系我们 二维码
TOP